Install Concrete Pad for Metal Storage Building at Fire Station #63
What this bid is
The City of Santa Cruz Fire Department wants a contractor to install a concrete pad and utilities for a metal storage building at Fire Station #63 in Santa Cruz, California. The pad must carry fire apparatus weighing about 55,000 lbs each. The scope includes saw cutting and removing existing asphalt, trenching for electrical and fire sprinkler lines, subgrade prep, forming, rebar, the pour and finish, and anchoring the building. It also covers removing an existing storm drain inlet connection and building a new bio-retention area. Electrical, above-ground sprinkler and building installers have already been selected, so you will need to coordinate with them.
The total project budget may not exceed $200,000, and bids must come in within that amount. A bid bond is required with the bid. A labor and performance bond and a materials bond follow after award. A mandatory pre-bid meeting is set for 10 November 2026 at 10:30 AM PST at 335 Younglove Avenue, and the notice says bids from anyone who did not attend are usually rejected unopened.
Who should bid
Electrical, Concrete, Demolition, Excavation & Grading, Fire Protection, General Contracting, Site Utilities contractors - the work is Santa Cruz, CA.
Deadline
19 November 2026, 2:00 PM PST (2 days remaining - last confirmed 17 Nov)
How to submit
On the agency's own system, not on BusyBids. Open the official notice
As the agency published it
City of Santa Cruz - Fire has issued invitation for bid, solicitation FIRE-0302.
Install a concrete pad and utilities for a metal storage building. The concrete must meet all specifications on the plans and will be able to hold the weight of fire apparatus of approximately 55,000 lbs each. Bidders shall be aware that electrical, above-ground fire sprinkler & building installer vendors have been selected. The following is the scope of work needed: Demolition (saw cut and removal of existing AC material) Utilities (trenching for electrical and fire sprinklers, electrical pipe installation) Concrete Pad Installation (includes subgrade preparation, form work, rebar installation, concrete pour and finish work, AC conforms, building anchorage installation) Remove existing storm drain inlet connection and install/connect new Bio-Retention Area. Bidders shall review and adhere to the following: Green Building Checklist Site management & bmps per plans Construction waste reduction, disposal and recycling Product gwp compliance Finish material pollutant control Coordinate and work with other contractors as required to execute all work listed on plans. Schedule, attend, and complete all required inspections for listed scope of work with the applicable City of Santa Cruz inspectors. All refuse and recycling activities during construction must comply with Chapter 6.12 of the Santa Cruz Municipal Code and be accounted for on the Construction Waste Management Plan. All work must comply with the building permit plans, as well as state and local codes. A bid bond is required for the project bid. A labor and performance bond and a materials bond will be required after the project is rewarded. The total project budget shall not exceed $200,000. Bidders shall submit bids that are within this maximum amount.
The City of Santa Cruz was incorporated in 1866 and formed its current charter in 1948. It is governed under a Council/Manager form of government. A Mayor and six Council members set policy for the City and a City Manager serves as chief administrator of those policies. The City is located on the coast, 75 miles south of San Francisco on the northern edge of the Monterey Bay. It encompasses 15.8 square miles with cultural and ethnic diversity among its population of 65,000. Santa Cruz is part of the National Marine Sanctuary and is a popular tourist destination owing to its beaches, surf culture, and historical landmarks. The City provides a full range of municipal services and facilities including a recreational wharf, public golf course, over thirteen hundred acres of open space, full beach services, refuse management, law enforcement, fire protection, and water and wastewater utilities. The City is also host to University of California Santa Cruz, the Santa Cruz Harbor, and the Santa Cruz Beach Boardwalk amusement park.
Responses are due November 19, 2026 at 2:00 PM PST.
Questions must be submitted by November 13, 2026 at 5:00 PM PST.
A mandatory pre-proposal conference is scheduled for November 10, 2026 at 10:30 AM PST at 335 Younglove Avenue, Santa Cruz, CA 95060.
Commodity categories: Concrete, Polymer, All Types; Curing Mixtures, All Types (For Curing Concrete); Hardeners, Concrete and Plaster; Risers and Cones, Reinforced Concrete; Coatings, Protective (For Masonry Including Concrete Floor); Coatings, Masonry (For Brick, Cinder Block, Concrete, etc.) (To Include Silicate Protective Coatings and Products), Environmentally Certified Products; Pipe, Concrete; Patching Mix, Asphalt Concrete.
Contact: Mike Venezio, Management Professional and Technical Assistant (mvenezio@santacruzca.gov, (831) 420-5280).
5 documents are attached to the notice: YOUNGLOVE AVE 335 B25-0290 APPROVED GEO TECH REPORT; YOUNGLOVE AVE 335 B25-0290 APPROVED PLANS; YOUNGLOVE AVE 335 B25-0290 APPROVED STRUCTURAL CALCS; Utilities Sheet C2.0; AGREEMENT sample for Opengov.
The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/santacruzca/projects/316038. Responses are submitted electronically there, and a free vendor account is required before you can upload one.
Reproduced from the official notice via OpenGov Procurement - California. The agency's page is the one that counts.
What the notice says
- Bond
- Mentioned; the notice gives no amount
- Site visit
- Mentioned
- Questions due
- 13 Nov 2026
Read from the notice's own wording. BusyBids holds the notice, not the attached documents, and never assesses whether you meet a requirement - confirm anything that matters with the issuing agency.
Check before bidding
- The notice mentions a bid, performance or payment bond - confirm the amount and the form with the agency before you price the job.
- The notice describes a mandatory site visit or pre-bid meeting - a bid from anyone who did not attend is usually rejected unopened.
- The notice lists a pre-bid meeting on 10 November - check whether attendance is mandatory.
- Questions close on 14 November, before the bid deadline.
- Only 2 days left to prepare a bid.
Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.
Important dates
Add all to calendar| Event | Date and time | |
|---|---|---|
| Pre-bid meetingcheck the notice for whether attendance is mandatory | 10 November 2026, 10:30 AM PST check | |
| Questions due | 13 November 2026, 5:00 PM PST check | |
| Bid deadline2 days remaining - last confirmed 17 Nov | 19 November 2026, 2:00 PM PST check | 2 days |
Times are shown in the agency's own zone. Confirm every deadline against the official notice.
Save this bid
We will remind you before it closes and tell you if the deadline moves. Free, no password, one click to stop.
We never share your address. No password needed.
Where this came from
Collected from OpenGov Procurement - California, first seen 31 October 2026, last confirmed 17 November 2026.
The notice text above and every date and requirement are reproduced from the source. Confirm every deadline against the official notice before you bid.
Something wrong with this listing? Tell us.
We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.
Similar open bids
-
Posted Nov 10 Checked today CityDue Nov 17, 11:00 AM PST Closes today
-
Posted Nov 9 Checked today CityDue Nov 17, 11:00 AM PST Closes today
-
Posted Oct 14 Checked today CountyBond requiredMandatory site visitDue Nov 17, 11:30 AM PST Closes today
-
Posted Oct 13 Checked today CityDue Nov 17, 12:00 PM PST Closes today
-
Due Nov 17, 12:00 PM PST Closes today
-
Posted Oct 30 Checked today CityDue Nov 17, 1:00 PM PST Closes today
About City of Santa Cruz
BusyBids has tracked 9 notices from City of Santa Cruz since September 2026, 6 of them open now. The open work falls under General Contracting, Fire Protection, Site Utilities.