Lower Spring Branch Stormwater Improvements
What this bid is
The City of Clearwater Public Works wants a contractor for the Lower Spring Branch stormwater project in Clearwater, Florida, aimed at reducing flooding. The work includes replacing the bridges on Springtime Avenue and Overbrook Avenue and building a double concrete box culvert on Douglas Avenue. The contract period is 548 consecutive calendar days.
Bids are due 4 November 2026 at 2:00 PM EST, and questions are due 21 October 2026 at 5:00 PM EDT. The notice describes a pre-proposal conference on 14 October 2026 at 10:00 AM EDT on Zoom and calls it non-mandatory, but BusyBids has flagged the meeting as mandatory, so confirm this on the portal before deciding. The bid must include copies of current Florida and, where applicable, Pinellas County license or registration. The bid also covers fixed project signs under Section III, Section 23, with the final count set at the start of the job.
Submit electronically through the City's OpenGov portal, which requires a free vendor account. The full solicitation, addenda and Q&A are there too. Questions go to Jennifer Burgett, Contract and Procurement Specialist, at jennifer.burgett@myclearwater.com or (727) 444-8207. The City decides who is awarded the work.
Who should bid
Concrete, General Contracting, Site Utilities contractors - the work is Clearwater, FL.
Deadline
9 December 2026, 2:00 PM EST (22 days remaining - last confirmed 17 Nov)
How to submit
On the agency's own system, not on BusyBids. Open the official notice
As the agency published it
City of Clearwater - Public Works has issued invitation to bid, solicitation 14-0048-EN.
Project consist of stormwater improvements to provide flood reduction with the replacement of bridges on Springtime Avenue and Overbrook Avenue and a double concrete box culvert on Douglas Avenue. The Contractor shall provide copies of a Current License/Registration with the state of Florida and Pinellas County (if applicable) in the bid response. The Contractor shall provide fixed project signs as described in Section III, Section 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor's schedule of work submitted for approval. Additional project signs may be required at no additional cost to the city due to the Contractor's schedule of work. Contract Period: 548 Consecutive Calendar Days
Responses are due November 4, 2026 at 2:00 PM EST.
Questions must be submitted by October 21, 2026 at 5:00 PM EDT.
A non-mandatory pre-proposal conference is scheduled for October 14, 2026 at 10:00 AM EDT at Zoom.
Contact: Jennifer Burgett, Contract and Procurement Specialist (jennifer.burgett@myclearwater.com, (727) 444-8207).
3 documents are attached to the notice: Lower Spring Branch Stormwater Improvements - Bid Phase Supplemental Technical Specifications; Lower Spring Branch Stormwater Improvements - Bid Plan Set _Validated; 20260918_REVERIFICATION LETTER SAJ-2021-01322.
The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/myclearwater/projects/304326. Responses are submitted electronically there, and a free vendor account is required before you can upload one.
Reproduced from the official notice via OpenGov Procurement - Florida. The agency's page is the one that counts.
What the notice says
- Site visit
- Mentioned
- Questions due
- 21 Oct 2026
Read from the notice's own wording. BusyBids holds the notice, not the attached documents, and never assesses whether you meet a requirement - confirm anything that matters with the issuing agency.
Check before bidding
- The notice describes a mandatory site visit or pre-bid meeting - a bid from anyone who did not attend is usually rejected unopened.
- The notice lists a pre-bid meeting on 14 October - check whether attendance is mandatory.
- Questions close on 21 October, before the bid deadline.
Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.
Important dates
Add all to calendar| Event | Date and time | |
|---|---|---|
| Pre-bid meetingcheck the notice for whether attendance is mandatory | 14 October 2026, 10:00 AM EDT check | |
| Questions due | 21 October 2026, 5:00 PM EDT check | |
| Bid deadline22 days remaining - last confirmed 17 Nov | 9 December 2026, 2:00 PM EST check | 22 days |
Times are shown in the agency's own zone. Confirm every deadline against the official notice.
Save this bid
We will remind you before it closes and tell you if the deadline moves. Free, no password, one click to stop.
We never share your address. No password needed.
Where this came from
Collected from OpenGov Procurement - Florida, first seen 30 September 2026, last confirmed 17 November 2026.
The notice text above and every date and requirement are reproduced from the source. Confirm every deadline against the official notice before you bid.
Something wrong with this listing? Tell us.
We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.
Similar open bids
-
Checked yesterday CountyDue Nov 17, 2:00 PM EST Closes today
-
Posted Nov 10 Checked today CityDue Nov 17, 2:00 PM EST Closes today
-
Posted Nov 12 Checked today CityDue Nov 17, 3:00 PM EST Closes today
-
Posted Oct 13 Checked today CityMandatory site visitDue Nov 17, 3:00 PM EST Closes today
-
Posted Oct 5 Checked today CountyDue Nov 17, 2:00 PM CST Closes today
-
Posted Oct 13 Checked today CityDue Nov 17, 3:00 PM EST Closes today
About City of Clearwater
BusyBids has tracked 13 notices from City of Clearwater since September 2026, 6 of them open now. The open work falls under General Contracting, Concrete, Drywall & Insulation.