Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC
Plain-English summary
Verify against the official noticeWhat the agency needs
Solicitation from Pcac (36C776) (Veterans Affairs, Department Of) — FL
Pcac (36C776) (Veterans Affairs, Department Of) has posted a federal contract opportunity with work in Gainesville, FL.
Notice type: Solicitation. Solicitation number: 36C77626B0026. NAICS code: 236220.
Responses are due September 24, 2026 at 1:00 PM UTC-04:00.
Set-aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14).
The full scope, drawings, wage determinations and submission instructions are on the SAM.gov notice itself. Federal bidding also requires an active SAM.gov registration with a Unique Entity ID before you can be awarded work, so start that early if you do not already have one.
Who should bid
General Contracting contractors - the work is Gainesville, FL. The notice flags Service-Disabled Veteran-Owned - confirm in the official notice whether that is a set-aside or a participation goal.
Deadline
24 September 2026, 1:00 PM EDT (last confirmed 21 Sep)
How to submit
On the agency's own system, not on BusyBids. Open the official notice · Bid documents
Important dates
Add all to calendar| Event | Date and time | |
|---|---|---|
| Bid deadlinelast confirmed 21 Sep | 24 September 2026, 1:00 PM EDT check | closed |
Times are shown in the agency's own zone. Confirm every deadline against the official notice.
Bid documents
- download Open
- download Open
- download Open
- download Open
- download Open
- download Open
- download Open
- download Open
- download Open
- download Open
- download Open
- download Open
Downloaded from the agency, not from us - we link the package rather than hosting a copy, so you always get the current version.
Where this came from
Collected from SAM.gov Federal Opportunities, first seen 19 September 2026, last confirmed 21 September 2026.
Dates and requirements are reproduced from the source. Confirm every deadline against the official notice before you bid.
Something wrong with this listing? Tell us.
We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.
Similar opportunities currently open
-
Posted Sep 11 CityDue Oct 2, 10:00 AM EDT Closes today
-
Posted Sep 2 CountyMandatory site visitDue Oct 2, 10:00 AM CDT Closes today
-
Posted Sep 6 CityDue Oct 2, 3:00 PM EDT Closes today
-
Posted Sep 16 FederalDue Oct 2, 3:00 PM EDT Closes today
-
Posted Sep 2 CountyPrequalification requiredDue Oct 5, 10:00 AM EDT 3 days left
-
Due Oct 5, 10:00 AM CDT 3 days left
What Department of Veterans Affairs has paid for this work
43 General Contracting contracts awarded in the last 2 years in this state, median $98,252.
- THE PATRIOTS SOLUTION GROUP CORP — $349,944 — 29 Sep 2026 — MIAMI_ EMERGENCY CHILLED WATER PUMP BUILDING 7 BASEMENT
- HAMILTON PACIFIC CHAMBERLAIN LLC — $219,379 — 29 Sep 2026 — EO 14398
- COVENTINA WATER, LLC — $113,060 — 25 Sep 2026 — FY26:DEIONIZED WATER SYSTEM MAINTENANCE LCHCC
Past contracts at this buyer, from USASpending.gov. They say what it has paid and to whom; they say nothing about who will win this bid.
Get bids like this by email
This bid has closed. Get new bids by email. Free, no password needed.
Set up free alerts