Fabrication, Permitting, and Installation of Walton County Gateway Signs (6 Locations)
Plain-English summary
Verify against the official noticeWhat the agency needs
Invitation To Bid from Walton County - DeFuniak Springs, FL
Walton County - Beach Operations has issued invitation to bid, solicitation 26-25.
The Project consists of the fabrication and installation of County-approved monument-style entrance signs, removal and/or relocation of existing signage at five (5) of the six (6) locations listed in the Scope of Work and depicted in the design reference package included as Attachment C, new foundation and site preparation at SR 20 West, and all associated permitting through the Florida Department of Transportation and Walton County, including compliance with Scenic Corridor regulations along US 98. Contract Time: The contract duration is days to substantial completion with an additional days for punch list completion.
Walton County's roadway entry points serve as the first impression for the visitors and residents who cross into the county each year, particularly along its major tourism corridors. The County's existing entrance signage is aging, and this project replaces it with a design reflecting Walton's coastal identity, built to current wind-load standards for a high-velocity hurricane zone.
Responses are due October 19, 2026 at 9:00 AM CDT.
Questions must be submitted by October 12, 2026 at 12:00 PM CDT.
A non-mandatory pre-proposal conference is scheduled for October 1, 2026 at 9:00 AM CDT at In-Person: Walton County Central Purchasing, 176 Montgomery Circle, DeFuniak Springs, FL 32435 OR Remote: Bidders may also attend the pre-bid meeting via Microsoft Teams. No download or Microsoft account is required — a web browser is sufficient. Microsoft Teams meeting Join: https://teams.microsoft.com/meet/295754538659370?p=5OastSU6iwPpq3Abae Meeting ID: 295 754 538 659 370 Passcode: U5Qt9UA7.
Commodity categories: Signs: Billboard, Advertising, etc.; Signs, Miscellaneous (Not Otherwise Classified); Sign Painting Services; Sign Making Services; Traffic Sign Installation and/or Removal Services.
Contact: Josh Ervin, Director of Beach Operations (josh+waltoncounty@wcfltourism.com, (850) 401-8225).
3 documents are attached to the notice: Contract No. 26-25; Public_Construction_Bond (26); [C] ITB 26-25 Gateway Sign Design Reference - 2026-09-22.
The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/waltoncountyfl/projects/305184. Responses are submitted electronically there, and a free vendor account is required before you can upload one.
Who should bid
Excavation & Grading, Signage contractors - the work is DeFuniak Springs, FL.
Deadline
19 October 2026, 9:00 AM CDT (17 days remaining - last confirmed 1 Oct)
How to submit
On the agency's own system, not on BusyBids. Open the official notice
Check before bidding
- The notice describes a mandatory site visit or pre-bid meeting - a bid from anyone who did not attend is usually rejected unopened.
- The notice lists a pre-bid meeting on 9 October - check whether attendance is mandatory.
- Questions close on 12 October, before the bid deadline.
Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.
Important dates
Add all to calendar| Event | Date and time | |
|---|---|---|
| Pre-bid meetingcheck the notice for whether attendance is mandatory | 9 October 2026, 9:30 AM CDT check | |
| Questions due | 12 October 2026, 12:00 PM CDT check | |
| Bid deadline17 days remaining - last confirmed 1 Oct | 19 October 2026, 9:00 AM CDT check | 17 days |
Times are shown in the agency's own zone. Confirm every deadline against the official notice.
Save this bid
We will remind you before it closes and tell you if the deadline moves. Free, no password, one click to stop.
We never share your address. No password needed.
Where this came from
Collected from OpenGov Procurement - Florida, first seen 25 September 2026, last confirmed 1 October 2026.
Dates and requirements are reproduced from the source. Confirm every deadline against the official notice before you bid.
Something wrong with this listing? Tell us.
We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.
Similar open bids
-
Posted Sep 6 CityDue Oct 2, 3:00 PM EDT Closes today
-
Posted Sep 3 Special districtDue Oct 5, 5:00 PM EDT 3 days left
-
Posted Sep 28 CountyDue Oct 6, 3:00 PM EDT 4 days left
-
Posted Sep 3 CityDue Oct 6, 3:00 PM EDT 4 days left
-
Due Oct 7, 2:00 PM EDT 5 days left
-
Posted Sep 14 CityDue Oct 7, 3:00 PM EDT 5 days left