What this bid is

The Berkshire Regional Planning Commission wants bids to replace an undersized culvert under Sleepy Hollow Road with a new bridge over Cone Brook in the Town of Richmond. The crossing sits about 0.4 miles east of the intersection of ST 41 and Sleepy Hollow Road. The new structure is a precast concrete frame with precast concrete wingwalls. The work also includes restoring the stream channel, since the brook is a designated cold-water fishery. The notice asks for a wildlife specialist for a turtle protection plan and says the work must follow the Richmond Conservation Order of Conditions, the state Division of Fish and Wildlife NHESP requirements and an Army Corps of Engineers general permit. The town will keep the road gravel.

The notice gives no dollar value or duration. It lists performance and payment bond forms, but the amounts are not stated in the notice text, so ask the agency about them before pricing. The notice calls the December 3, 2026 11:00 AM EST pre-proposal conference non-mandatory. Questions are due December 10, 2026 at 4:00 PM EST, and bids close December 17, 2026 at 1:00 PM EST. Contact Rebecca Slick at rslick@berkshireplanning.org or (413) 442-1521 Ext: 54.

Who should bid

Concrete, General Contracting, Site Utilities contractors - the work is Pittsfield, MA.

Deadline

17 December 2026, 1:00 PM EST (30 days remaining - last confirmed 17 Nov)

How to submit

On the agency's own system, not on BusyBids. Open the official notice

As the agency published it

Berkshire Regional Planning Commission - Group Purchasing has issued invitation for bid, solicitation FY27-RICHMOND.

The Sleepy Hollow Road Bridge Replacement Project is located on a rural road in the Town of Richmond located approximately.4 miles east from the intersection of ST 41 and Sleepy Hollow Road. See Location Map below. The bridge crosses Cone Brook, a designated Cold-Water Fishery to the south of the crossing; therefore, construction must protect the stream and restore it to its natural state. Work shall be done, according to the Order of Conditions, Ma Division of Fish & Wildlife NHESP and the Army Corp of Engineers General Permit. The project will require wildlife specialist as part of the turtle protection plan and requirements with the Richmond’s Conservation Order of Conditions. The existing culvert is considered too small to convey high stream flows which has caused significant road overtopping and erosion. The proposed replacement project will replace the culvert with a precast concrete frame structure with precast concrete wingwalls and restore the stream channel to its natural state. The Town will keep the gravel road and not pave it.

Responses are due December 17, 2026 at 1:00 PM EST.

Questions must be submitted by December 10, 2026 at 4:00 PM EST.

A non-mandatory pre-proposal conference is scheduled for December 3, 2026 at 11:00 AM EST at .4 miles east from the intersection of ST 41 and Sleepy Hollow Road.

Contact: Rebecca Slick, Group Purchasing Coordinator (rslick@berkshireplanning.org, (413) 442-1521 Ext: 54).

8 documents are attached to the notice: SECTION 00500 – OWNER-CONTRACTOR AGREEMENT FOR PUBLIC WORKS CONSTRUCTION; SECTION 00610 - PERFORMANCE BOND; SECTION 00620 - PAYMENT BOND; WageSchedule_20261021131936 Sleepy Hollow; 3-24-95 R-06-016 SIGNED PLANS; 20261006 R06016 Special Provisions_Final; Conservation Commission Memo; Richmond Prequal Approval 12.17.26.

The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/berkshire-planning/projects/322385. Responses are submitted electronically there, and a free vendor account is required before you can upload one.

Reproduced from the official notice via OpenGov Procurement - Massachusetts. The agency's page is the one that counts.

What the notice says

Bond
Mentioned; the notice gives no amount
Site visit
Mentioned
Questions due
10 Dec 2026

Read from the notice's own wording. BusyBids holds the notice, not the attached documents, and never assesses whether you meet a requirement - confirm anything that matters with the issuing agency.

Check before bidding

  • The notice mentions a bid, performance or payment bond - confirm the amount and the form with the agency before you price the job.
  • The notice describes a mandatory site visit or pre-bid meeting - a bid from anyone who did not attend is usually rejected unopened.
  • The notice lists a pre-bid meeting on 3 December - check whether attendance is mandatory.
  • Questions close on 10 December, before the bid deadline.

Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.

Important dates

Add all to calendar
EventDate and time
Pre-bid meetingcheck the notice for whether attendance is mandatory 3 December 2026, 11:00 AM EST check
Questions due 10 December 2026, 4:00 PM EST check
Bid deadline30 days remaining - last confirmed 17 Nov 17 December 2026, 1:00 PM EST check 30 days

Times are shown in the agency's own zone. Confirm every deadline against the official notice.

Save this bid

We will remind you before it closes and tell you if the deadline moves. Free, no password, one click to stop.

We never share your address. No password needed.

Where this came from

Collected from OpenGov Procurement - Massachusetts, first seen 12 November 2026, last confirmed 17 November 2026.

The notice text above and every date and requirement are reproduced from the source. Confirm every deadline against the official notice before you bid.

Something wrong with this listing? Tell us.

We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.

Similar open bids