The City of Santa Cruz Public Works is asking for proposals from consulting firms to handle environmental work for the Pump Station No. 1 and Soquel Pump Station project in Santa Cruz, California (RFP No. PW-0302). The services requested are CEQA and NEPA review and environmental permitting. The notice says the project is federally funded and asks firms to show experience with federally funded grant projects and with managing sub-consulting teams through multi-step environmental reviews.
The background material describes flood relief for the downtown area, with a new pump station at the southwestern corner of the Soquel Ave bridge crossing as one option being considered. The notice lists nine attached documents, including a sample agreement and a sample cost proposal.
Questions are due 11 September 2026 at 5:00 PM PDT and proposals are due 2 October 2026 at 5:00 PM PDT. Responses are submitted electronically through the City's OpenGov portal, and a free vendor account is needed to upload one. The City decides which proposal, if any, is selected.
Who should bid
Fire Protection, Site Utilities contractors - the work is Santa Cruz, CA.
Deadline
2 October 2026, 5:00 PM PDT (last confirmed 2 Oct)
How to submit
On the agency's own system, not on BusyBids. Open the official notice
As the agency published it
City of Santa Cruz - Public Works has issued request for proposal, solicitation RFP No. PW-0302.
The City is seeking experienced firms to provide CEQA, NEPA, and environmental permitting services for the Pump Station No. 1 and Soquel Pump Station project. This is a federally funded project serving a highly engaged community, and the selected firm must bring both technical depth and strong communication skills to navigate a complex environmental review process. Qualified firms will demonstrate expertise in regulatory compliance and best management practices, familiarity with relevant case law and its potential procedural implications, and a proven track record managing sub-consulting teams through multi-step environmental reviews. Firms must also have experience with federally funded grant projects and a history of delivering high-quality work on time and to professional standards.
The City of Santa Cruz was incorporated in 1866 and formed its current charter in 1948. It is governed under a Council/Manager form of government. A Mayor and six Council members set policy for the City and a City Manager serves as chief administrator of those policies. The City is located on the coast, 75 miles south of San Francisco on the northern edge of the Monterey Bay. It encompasses 15.8 square miles with cultural and ethnic diversity among its population of 65,000. Santa Cruz is part of the National Marine Sanctuary and is a popular tourist destination owing to its beaches, surf culture, and historical landmarks. The City provides a full range of municipal services and facilities including a recreational wharf, public golf course, over thirteen hundred acres of open space, full beach services, refuse management, law enforcement, fire protection, and water and wastewater utilities. The City is also host to University of California Santa Cruz, the Santa Cruz Harbor, and the Santa Cruz Beach Boardwalk amusement park. Pump Station No. 1 was originally constructed in 1959 as part of the San Lorenzo River levee system. Pump Station No. 1 collects drainage from the downtown area. Recent hydraulic modeling as part of the City’s ongoing FEMA certification effort indicated improvements to the existing downtown storm drain and pump station network may alleviate expected flooding after a major rain event. The City contracted Balance Hydrologics to complete an in-depth hydraulic analysis of Pump Station No. 1 and its tributary storm drains. The City contracted with Schaff & Wheeler to develop a Basis of Design report based on Balance Hydrologics’ findings. The reports indicate that: 1. The conveyance limitations of the existing storm drain network do not justify upsizing the existing Pump Station 1 outfall pipes and levee penetrations. 2. The toe-drain which runs along the outward toe of the west levee limits the conveyance of stormwater from the north downtown region to Pump Station 1. Upsizing the toe-drain is infeasible due to recent private development adjacent to the toe-drain. 3. A new pump station located at the southwestern corner of the Soquel Ave bridge crossing would help alleviate flooding in the north downtown area.
Responses are due October 2, 2026 at 5:00 PM PDT.
Questions must be submitted by September 11, 2026 at 5:00 PM PDT.
Contact: Michael Dyer, Project Manager II (mdyer@santacruzca.gov, (831) 420-5037).
9 documents are attached to the notice: Sample Agreement - PS-1 and Soquel PS Environmental; San Lorenzo River Channel Improvement Project - As-Built Plans; Preliminary Hydraulic Analysis; Pump Station 1 Preliminary Basis of Design; Soquel Avenue Pump Station Preliminary Basis of Design; Sample_Cost_Proposal_1_-_Cost_Plus_Fixed_Fee (2); Environmental BRIC Grant and Schedule; downtown-plan-appendix-8-south-of-laurel-area.
The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/santacruzca/projects/256461. Responses are submitted electronically there, and a free vendor account is required before you can upload one.
Reproduced from the official notice via OpenGov Procurement - California. The agency's page is the one that counts.
What the notice says
- Questions due
- 11 Sep 2026
Read from the notice's own wording. BusyBids holds the notice, not the attached documents, and never assesses whether you meet a requirement - confirm anything that matters with the issuing agency.
Check before bidding
- Questions close on 12 September, before the bid deadline.
Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.
Important dates
Add all to calendar| Event | Date and time | |
|---|---|---|
| Questions due | 11 September 2026, 5:00 PM PDT check | |
| Bid deadlinelast confirmed 2 Oct | 2 October 2026, 5:00 PM PDT check | closed |
Times are shown in the agency's own zone. Confirm every deadline against the official notice.
Where this came from
Collected from OpenGov Procurement - California, first seen 25 September 2026, last confirmed 2 October 2026.
The notice text above and every date and requirement are reproduced from the source. Confirm every deadline against the official notice before you bid.
Something wrong with this listing? Tell us.
We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.
Similar opportunities currently open
-
Due Nov 17, 2:00 PM PST Closes today
-
Due Nov 17, 3:00 PM PST Closes today
-
Posted Oct 16 Checked today CityMandatory site visitDue Nov 18, 4:00 PM PST 1 day left
-
Posted Sep 29 Checked today Special districtDue Nov 19, 11:00 AM PST 2 days left
-
Posted Oct 30 Checked today CityBond requiredMandatory site visitDue Nov 19, 2:00 PM PST 2 days left
-
Posted Oct 29 Checked today Special districtDue Nov 19, 2:00 PM PST 2 days left
About City of Santa Cruz
BusyBids has tracked 9 notices from City of Santa Cruz since September 2026, 6 of them open now. The open work falls under General Contracting, Fire Protection, Site Utilities.