Camping World Stadium Converged Network System (CNS) Design and Installation Project
Plain-English summary
Verify against the official noticeWhat the agency needs
Request For Proposal from City of Orlando - Orlando, FL
City of Orlando - Orlando Venues has issued request for proposal, solicitation RFP26-0578.
City of Orlando is seeking proposals from qualified vendors for the installation of a comprehensive network and wi-fi system at Camping World Stadium (“Stadium”) which is currently under renovation in Orlando FL. The objective is to replace the core network, including all edge switching, and the wi-fi system in the stadium. The goal is an elevated, more reliable fan experience that is expected in a world class facility
The project involves the design and installation of a robust network and wi-fi infrastructure for an approximately 66,000-seat outdoor football stadium, including switches, wi-fi access points, and related equipment, to ensure seamless connectivity for fans, staff, and vendors within the Stadium. This network will be a net new endeavor. This system is intended to be a turnkey system. There will be no requirements for ongoing support for this system after the installation and initial operating period. We will be utilizing the building’s existing fiber backbone, but none of the Cat5/6 cable will be reused. This project cutover needs to be incredibly well coordinated with City of Orlando as there will be events occurring during the renovation that will use the old network. As part of the design, we would like a proposed cutover plan to be submitted that achieves our proposed schedule while working around active construction and events. The system will be 100% operational by July of 2027. Camping World Stadium will be hosting the Jacksonville Jaguars for the entire 2027 season so this date cannot be missed under any circumstances. The Selected Vendor will contract through City of Orlando for business terms of the agreement including, but not limited to, technical design review with owner and project team, installation of the system, coordination with internal and external stakeholders, and initial support of the system through a contracted number of events. The Selected Vendor will coordinate with owner’s representatives (Legends Global), low voltage design and engineering contractors (Henderson), construction manager (Barton Mallow / AECOM), and others as necessary to ensure successful completion of the scope of work within the project schedule and project budget. The Selected Vendor will provide a project manager as a single point of contact to work with ownership and the project team throughout the entire project. The PM will attend meetings both on-site and virtual as necessary and will be on-site as necessary throughout the construction process.
Responses are due October 20, 2026 at 2:00 PM EDT.
Questions must be submitted by September 28, 2026 at 5:00 PM EDT.
A mandatory pre-proposal conference is scheduled for September 23, 2026 at 10:00 AM EDT at The Mandatory Pre-Proposal Meeting will be held in the FCS Varsity Club, located at: One Citrus Bowl Place Orlando, FL 32805 Enter through McCracken Field entrance (corner of Tampa Ave & Long St.) and park in Lot 6. Transportation & Parking Map provided as Exhibit 4. ALL MANDATORY REQUIREMENTS STATED IN SECTION 6.5 Mandatory Pre-Proposal Conference Requirements MUST BE RECIEVED BY THE REQUIRED DATE PROVIDED OR YOU WILL NOT ENTER THE STADIUM FOR THE WALKTHROUGH.
Commodity categories: Network Components: Adapter Cards, Bridges, Connectors, Expansion Modules/Ports, Firewall Devices, Hubs, Line Drivers, MSAUs, Routers, Transceivers, etc.; Cables: Printer, Disk, Network, etc.; Network Components: Adapter Cards, Bridges, Connectors, Expansion Modules/Ports, Hubs, Line Drivers, MSAUs, Routers, Transceivers, etc.; Communications: Networking, Linking, etc. (Includes Clustering Software); Communications: Networking, Linking, etc.; Communications: Networking, Linking, Fiber Modems, Power Over Ethernet, Wireless; Networking Services (Including Installation, Security, and Maintenance).
Contact: Lindsey Hladik, CPPB, FCCM, Procurement Agent II (lindsey.hladik@orlando.gov, (407) 246-2332).
4 documents are attached to the notice: Exhibit 4 - CWS Pre-Proposal Conference Map; Exhibit 1 - Contract; Exhibit #2 - NDA - CWS; Exhibit 3 - CWS Event Schedule.
The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/orlando/projects/295446. Responses are submitted electronically there, and a free vendor account is required before you can upload one.
Who should bid
General Contracting, Low Voltage & Telecom contractors - the work is Orlando, FL.
Deadline
20 October 2026, 2:00 PM EDT (18 days remaining - last confirmed 1 Oct)
How to submit
On the agency's own system, not on BusyBids. Open the official notice
Check before bidding
- The notice describes a mandatory site visit or pre-bid meeting - a bid from anyone who did not attend is usually rejected unopened.
- The notice lists a pre-bid meeting on 23 September - check whether attendance is mandatory.
- Questions close on 28 September, before the bid deadline.
Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.
Important dates
Add all to calendar| Event | Date and time | |
|---|---|---|
| Pre-bid meetingcheck the notice for whether attendance is mandatory | 23 September 2026, 10:00 AM EDT check | |
| Questions due | 28 September 2026, 5:00 PM EDT check | |
| Bid deadline18 days remaining - last confirmed 1 Oct | 20 October 2026, 2:00 PM EDT check | 18 days |
Times are shown in the agency's own zone. Confirm every deadline against the official notice.
Save this bid
We will remind you before it closes and tell you if the deadline moves. Free, no password, one click to stop.
We never share your address. No password needed.
Where this came from
Collected from OpenGov Procurement - Florida, first seen 25 September 2026, last confirmed 1 October 2026.
Dates and requirements are reproduced from the source. Confirm every deadline against the official notice before you bid.
Something wrong with this listing? Tell us.
We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.
Similar open bids
-
Posted Sep 11 CityDue Oct 2, 10:00 AM EDT Closes today
-
Posted Sep 2 CountyMandatory site visitDue Oct 2, 10:00 AM CDT Closes today
-
Posted Sep 16 FederalDue Oct 2, 3:00 PM EDT Closes today
-
Posted Sep 6 CityDue Oct 2, 3:00 PM EDT Closes today
-
Posted Sep 2 CountyPrequalification requiredDue Oct 5, 10:00 AM EDT 3 days left
-
Due Oct 5, 10:00 AM CDT 3 days left