Invitation to Bid from City of Port Orange - Port Orange, FL
City of Port Orange - Engineering has issued invitation to bid, solicitation ITB-26-16-CW.
This project consists of the rehabilitation of the (3) three Transfer Pump Stations at the Port Orange Water Treatment Plant for the North, Central and South treatment trains. The (2) two existing vertical transfer pumps in each station will be replaced with upgraded associated piping, pipe supports, electrical and concrete pump pads. Restoration including sod replacement, concrete, soil, and gravel replacement in kind will be required at all disturbed areas.
The Port Orange Water Treatment Plant, officially known as the Garnsey Water Treatment Plant, is the City's primary drinking water production facility. It is located at 4400 Wellfield Drive in Port Orange and is operated by the City's Public Utilities Department. The facility is a conventional lime-softening treatment plant that processes groundwater from approximately 40 production wells and has a permitted treatment capacity of 15 million gallons per day (MGD).
Responses are due October 23, 2026 at 2:30 PM EDT.
Questions must be submitted by October 2, 2026 at 4:00 PM EDT.
A non-mandatory pre-proposal conference is scheduled for September 28, 2026 at 10:00 AM EDT at Council Chambers, located at the City of Port Orange at 1000 City Center Circle, Port Orange, FL 32129.
Commodity categories: Construction Services, Heavy (Incl. Maintenance And Repair Services); Construction and Upgrades, Wastewater Treatment Plant; Maintenance and Repair, Wastewater Treatment Plant; Public Works And Related Services; Wastewater Treatment Plant, Operations, and Testing.
Contact: Junos Reed, City Engineer (jureed@port-orange.org, (386) 506-5754).
5 documents are attached to the notice: Port_Orange_Transfer_Pump_Station_Upgrades_100__Plans; Attachment 1 - Schedule of Unit Pricing; Attachment 1 - Schedule of Unit Pricing; Port_Orange_-_Transfer_Pump_Station_Upgrades_100__Specifications (2); WATERMARKED_DRAFT_-_Standard_Contract_for_Services_with_Bond_(021323)_Attached P&P.
The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/portorangefl/projects/294921. Responses are submitted electronically there, and a free vendor account is required before you can upload one.
Who should bid
Electrical, Landscaping, Concrete, General Contracting, Site Utilities contractors - the work is Port Orange, FL.
Deadline
23 October 2026, 2:30 PM EDT (21 days remaining - last confirmed 1 Oct)
How to submit
On the agency's own system, not on BusyBids. Open the official notice
Check before bidding
- The notice describes a mandatory site visit or pre-bid meeting - a bid from anyone who did not attend is usually rejected unopened.
- The notice lists a pre-bid meeting on 28 September - check whether attendance is mandatory.
- Questions close on 9 October, before the bid deadline.
Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.
Important dates
Add all to calendar| Event | Date and time | |
|---|---|---|
| Pre-bid meetingcheck the notice for whether attendance is mandatory | 28 September 2026, 10:00 AM EDT check | |
| Questions due | 9 October 2026, 4:00 PM EDT check | |
| Bid deadline21 days remaining - last confirmed 1 Oct | 23 October 2026, 2:30 PM EDT check | 21 days |
Times are shown in the agency's own zone. Confirm every deadline against the official notice.
Save this bid
We will remind you before it closes and tell you if the deadline moves. Free, no password, one click to stop.
We never share your address. No password needed.
Where this came from
Collected from OpenGov Procurement - Florida, first seen 25 September 2026, last confirmed 1 October 2026.
Dates and requirements are reproduced from the source. Confirm every deadline against the official notice before you bid.
Something wrong with this listing? Tell us.
We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.
Similar open bids
-
Posted Sep 11 CityDue Oct 2, 10:00 AM EDT Closes today
-
Posted Sep 2 CountyMandatory site visitDue Oct 2, 10:00 AM CDT Closes today
-
Posted Sep 28 CityDue Oct 2, 2:00 PM EDT Closes today
-
Posted Sep 10 CityDue Oct 2, 2:30 PM EDT Closes today
-
Posted Sep 16 FederalDue Oct 2, 3:00 PM EDT Closes today
-
Posted Sep 1 CountyDue Oct 2, 2:00 PM CDT Closes today