Records Storage Facility Roof Replacement
Plain-English summary
Verify against the official noticeWhat the agency needs
Construction Bid Document from County of Hernando - Brooksville, FL
County of Hernando - Facilities Maintenance has issued construction bid document, solicitation 26-C01336.
Remove existing gravel built-up roof and install new torch ply. Replace existing roof drain, in-large scuppers, install new coping cap and flashing, add guard railing, walk-pads, splash block.
The existing roof is past its life cycle and is in need of replacement.
Responses are due October 12, 2026 at 10:00 AM EDT.
Questions must be submitted by September 21, 2026 at 5:00 PM EDT.
A mandatory pre-proposal conference is scheduled for September 16, 2026 at 10:00 AM EDT at Records Storage Facility 234 E. Jefferson St., Brooksville, FL 34601.
Commodity categories: Roofing; Asphalt, Roofing; Coatings, Roof, All Kinds; Tape, Roofing: Rubber, etc.; Roofing, Gutters, and Downspouts Maintenance and Repair; Roofing and Siding.
Contact: Julie Crull, Contracting Agent II (jcrull@co.hernando.fl.us, (352) 754-4020).
6 documents are attached to the notice: Hernando County Records Storage Building Reroofing Drawings-d2 Sealed; Hernando County Records Storage Building Reroofing Project Manual-d2 Sealed; Asbestos Survey - Records Storage Building; Sample Construction Contract 26-C01336; Construction Documents Required After Award; Holiday Schedule-2026.
The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/hernandocounty/projects/281913. Responses are submitted electronically there, and a free vendor account is required before you can upload one.
Who should bid
Roofing, Welding & Metal Fab, General Contracting contractors - the work is Brooksville, FL.
Deadline
12 October 2026, 10:00 AM EDT (10 days remaining - last confirmed 1 Oct)
How to submit
On the agency's own system, not on BusyBids. Open the official notice
Check before bidding
- The notice describes a mandatory site visit or pre-bid meeting - a bid from anyone who did not attend is usually rejected unopened.
- The notice lists a pre-bid meeting on 16 September - check whether attendance is mandatory.
- Questions close on 21 September, before the bid deadline.
Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.
Important dates
Add all to calendar| Event | Date and time | |
|---|---|---|
| Pre-bid meetingcheck the notice for whether attendance is mandatory | 16 September 2026, 10:00 AM EDT check | |
| Questions due | 21 September 2026, 5:00 PM EDT check | |
| Bid deadline10 days remaining - last confirmed 1 Oct | 12 October 2026, 10:00 AM EDT check | 10 days |
Times are shown in the agency's own zone. Confirm every deadline against the official notice.
Save this bid
We will remind you before it closes and tell you if the deadline moves. Free, no password, one click to stop.
We never share your address. No password needed.
Where this came from
Collected from OpenGov Procurement - Florida, first seen 25 September 2026, last confirmed 1 October 2026.
Dates and requirements are reproduced from the source. Confirm every deadline against the official notice before you bid.
Something wrong with this listing? Tell us.
We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.
Similar open bids
-
Posted Sep 11 CityDue Oct 2, 10:00 AM EDT Closes today
-
Posted Sep 2 CountyMandatory site visitDue Oct 2, 10:00 AM CDT Closes today
-
Posted Sep 16 FederalDue Oct 2, 3:00 PM EDT Closes today
-
Posted Sep 6 CityDue Oct 2, 3:00 PM EDT Closes today
-
Posted Sep 2 CountyPrequalification requiredDue Oct 5, 10:00 AM EDT 3 days left
-
Due Oct 5, 10:00 AM CDT 3 days left