Sole Source: Teledyne ISCO Flow and Rainfall Monitor Parts, Equipment, Training and Associated Services and Licenses.
Plain-English summary
Verify against the official noticeWhat the agency needs
Sole/Single Source from County of DeKalb, GA - Decatur, GA
County of DeKalb, GA - Purchasing & Contracting has issued sole/single source, solicitation 2026-139-SS.
Procurement Details: Flow and Rainfall Monitoring Program Estimated Value: TBD Term (Years): 2 Years Vendor: Teledyne ISCO Justification: The County owns and utilizes Teledyne ISCO flow monitors and rain gauges. Teledyne ISCO is the sole manufacturer authorized to provide compatible parts and services for the existing equipment.
DeKalb County Department of Watershed Management’s (DWM) Wastewater Collection and Transmission System (WCTS) includes an estimated 2,600 miles of sanitary sewer lines, 66 lift stations and 70,000 manholes. Per the Consent Decree (CD) entered with the United States Environmental Protection Agency and Georgia Environmental Protection Division, the County maintains a System-wide Flow and Rainfall Monitoring Program. On average, the County maintains 300 flow monitors and 40 rain gauges used for model calibration, to quantify sanitary sewer overflow (SSO) volumes, identify areas of high I/I, provide flow data for design and construction, etc. This contract is to provide parts and equipment associated with the flow monitors and rain gauges as well as any training and support needed, and associated software and licenses.
Responses are due October 2, 2026 at 3:00 PM EDT.
Commodity categories: Controls, Cooling Tower Water Treatment: pH, Conductivity, Corrosion Sensors; Computer Instructional Aids and Training Devices, Environmentally Certified Products; Controlling, Indicating, Measuring, Monitoring, And Recording Instruments And Supplies; Charts: Flowmeter, Receiver, Recorder; Flow Controllers and Recorders (For Liquids); Gauges: Altitude, Pressure, Profile, Temperature, Liquid Level, etc.; Water Quality Monitoring Equipment: BOD Analyzers, Turbidimeters, Well Samplers, etc.; Testing and Monitoring Services for Air, Gas, and Water.
Contact: Giovanni MulinelliRamos, Procurement Technician (gmulinelliramos@dekalbcountyga.gov, (404) 371-7058).
2 documents are attached to the notice: Teledyne_ISCO_Flow_Monitor_Parts_Technical_Specs; Public_Notice.
The full solicitation document, addenda and the question-and-answer thread are on the agency's OpenGov portal at https://procurement.opengov.com/portal/dekalbcountyga/projects/305317. Responses are submitted electronically there, and a free vendor account is required before you can upload one.
Who should bid
Plumbing, General Contracting, Site Utilities contractors - the work is Decatur, GA.
Deadline
2 October 2026, 3:00 PM EDT (closes today - last confirmed 1 Oct)
How to submit
On the agency's own system, not on BusyBids. Open the official notice
Check before bidding
- Closes today.
Taken from the notice as published. BusyBids does not assess whether you meet a requirement - confirm anything that matters with the issuing agency.
Important dates
Add all to calendar| Event | Date and time | |
|---|---|---|
| Bid deadlinecloses today - last confirmed 1 Oct | 2 October 2026, 3:00 PM EDT check | today |
Times are shown in the agency's own zone. Confirm every deadline against the official notice.
Save this bid
We will remind you before it closes and tell you if the deadline moves. Free, no password, one click to stop.
We never share your address. No password needed.
Where this came from
Collected from OpenGov Procurement - Georgia, first seen 26 September 2026, last confirmed 1 October 2026.
Dates and requirements are reproduced from the source. Confirm every deadline against the official notice before you bid.
Something wrong with this listing? Tell us.
We reproduce what the agency published. If we got it wrong we want to know - a wrong deadline can cost you a bid.
Similar open bids
-
Posted Sep 1 CountyMandatory site visitDue Oct 5, 10:00 AM EDT 3 days left
-
Posted Sep 14 CountyBond requiredPrevailing wage appliesDue Oct 7, 3:00 PM EDT 5 days left
-
Posted Aug 17 CountyBond requiredPrevailing wage appliesMandatory site visitDue Oct 8, 3:00 PM EDT 6 days left
-
Posted Sep 10 CountyMandatory site visitDue Oct 8, 3:00 PM EDT 6 days left
-
Posted Sep 10 CountyPrequalification requiredMandatory site visitDue Oct 8, 3:00 PM EDT 6 days left
-
Due Oct 12, 10:00 AM EDT 10 days left